CMA Excess Prepreg Used in Newly Expanded Aquatic Center

CMA Excess Prepreg Used in Newly Expanded Aquatic Center

October 23, 2020

The Composite Recycling Technology Center (CRTC) built composite benches made with CMA excess Prepreg which was installed at the expanded Shore Aquatic Center in Port Angeles, WA. The Aquatic Center grand opening was last Friday (10/23) where four bodies of water for various activities and updated features such as the Prepreg benches were revealed. Check it out here: https://youtu.be/m733HHySars